2.1Premium · 10–16 weeks · Decision file output

Tariff and Production Scenario Design

Origin Engineering — Tariff and Production Location Scenario Design

If you cannot meet the origin rule, we redesign the production flow. Three scenarios, each with its origin outcome, cost and defensibility calculated.

Promise

We produce three workable scenarios, calculate the origin outcome, defensibility and economics of each, and bring the resulting process innovations under protection.

What is it?

Scenarios are built on four levers: changing the country of origin of an input, bringing a process step in-house, constructing the product differently, or moving a step elsewhere. Each lever has a different origin effect, cost and timescale.

This work produces three outcomes at once: an improved origin position, a tariff result and — often overlooked — a protectable process innovation.

Why is it necessary?

Investment decisions are irreversible. A decision taken without calculating the origin outcome, defensibility and break-even point of three scenarios makes a multi-million-euro error permanent.

The party able to protect the resulting innovation is a registered patent attorney. A compliance consultant cannot lawfully take that step — and an unprotected innovation becomes a cost item a competitor can copy freely.

What do we promise?

  • We give three scenarios, each with investment, unit cost, commissioning time and origin outcome calculated
  • We calculate the break-even point and state plainly where a scenario is at a cost disadvantage
  • We design the pilot production and the verification plan for the selected scenario
  • We screen the resulting process innovations for patentability and write the protection strategy

Who is it for?

Companies whose origin position falls short; manufacturers with a high share of imported inputs or assembly-weighted operations; medium and large industrial companies seeking to secure their supply position in the EU.

How do we work?

  1. 1Statement of purpose and acceptance assessment
  2. 2Fixing the current state as a reference
  3. 3Technical design of three scenarios
  4. 4Origin impact analysis for each scenario
  5. 5Cost, investment and break-even calculation
  6. 6Pilot production design and verification plan
  7. 7Intellectual property screening and protection strategy

Our limits

This work is not offered as a method of avoiding a trade defence measure and will not be accepted if requested for that purpose. The purpose of the request is recorded at project start through a signed Statement of Purpose.

Related services